Calendar

In addition to the frequency of the scheduler, you can schedule the list of execution, set weekends, holidays, and other dates of exceptions using the Calendar item. The schedule in the calendar can be of different types: for a date, weekly, annual, holiday, and more. To create a schedule, call the menu New Calendar and define your calendar.

 

 

img_1 The name of the calendar is specified in the field Name.

img_2 In the field Description, you may specify additional information about the calendar or other information.

img_3 The Delete button deletes the selected schedule item in the calendar

img_4 If you want to remove all scheduler items in the calendar, click Delete All.

img_5 The Calendar items panel shows all the elements of the schedule, the time and date by which the action of the scheduler will be implemented.

img_6 On the New Calendar panel you can define settings of an item schedule. Depending on the Item type, other parameters may vary. Once the parameters are defined, the element, press the button Add to the element with the current settings written in the list of calendar items.

 

 

Types of calendars

Depending on the selected type, different parameters can be shown.

strel11 The Date type. The parameter of the schedule is a specific day, month, year, and time. Also, a day of the week corresponding to the selected date is displayed.

strel11 The type Weekly. For the calendar of this type, it is necessary to determine the day of the week.

strel11 The type Annual. For the annual schedule, you should specify the month of the year and the day of the month.

strel11 The type Relative day of the year. In this case, the calendar will not be "tied" to a specific date. The schedule parameters are:

information Priority: First, Second, Third, Fourth, Last.

information The day of the week.

information The month of the year.

 

strel11 The Holidays type. This type of calendar provides an opportunity to create a schedule considering country holidays. For this type, you should choose a country. After this, the list of holidays, which may be present in the schedule, will be displayed on the panel of new items. If necessary, you can add one holiday or all at once to the items of the calendar.

 

strel11 The type Easter. Schedule for this type will be calculated off-day of Easter, which is the start date, and it measured the number of days to offset. You should know that if this year Easter has passed, the reference point is Easter next year. Consider the examples of indications of some values:

information The minimum value that can be specified is -365. The calendar date will be a day before Easter - 365 days.

information The maximum value that can be specified is 365. The calendar date will be the day after the Easter day +365 days.

information If the number of days is not specified or is 0, then, in this case, the date of the calendar will be Easter (if Easter has passed this year, it will be a day of Easter next year, if the day of Easter had not yet arrived - in the current year).

 

Information

 

If the next year is a leap year and the date of the schedule falls on a day after February, then you should always add 1 to the offset.